Forum · Gallery · Wiki · Shop · Sponsors


Home > Member Galleries > jonesy63 > Safari Snorkel Install

TITLE  +   - 
FILE NAME  +   - 
DATE  +   - 
POSITION  +   - 
IMG_0083.JPG
Before photo.116 views
IMG_0084.JPG
Inlet grill removed126 views
IMG_0085.JPG
Template in place to drill holes through guard.148 views
IMG_0088.JPG
Bottom of airbox, showing one-way valve and locating lug176 views
IMG_0091.JPG
Inside factory air duct - showing felt-like material (used to absorb fumes)152 views
IMG_0092.JPG
Factory air duct - showing vinyl covering152 views
IMG_0093.JPG
A pillar template in place - ready to drill (through extremely hard metal!)167 views
IMG_0094.JPG
A pillar mount pop-rivetted in place and form-a-gasket used to seal underneath161 views
IMG_0095.JPG
A pillar mount installed166 views
IMG_0097.JPG
Marked inner guard with template to enlarge hole in channel154 views
IMG_0099.JPG
Drilled first, then used cut off wheel on Dremel to "join the dots", then painted.151 views
IMG_0103.JPG
Half way finished cutting aibox inlet with Dremel - as it was too large to fit the 83mm flexible hose onto it.161 views
IMG_0104.JPG
Cut out of inner guard completed - to allow 83mm flexible hose through, as the smaller hole in channel was too small.164 views
IMG_0105.JPG
Airbox showing inner inlet tube poking through189 views
IMG_0106.JPG
Looking down at jubilee clamp holding flexible hose to airbox inlet.183 views
IMG_0107.JPG
Finished the install!254 views
16 files on 1 page(s)